Frame inspection in Gables

The structure checked against its engineering while every connection is visible.

  • Frame and trusses standing, roof cover on, before sarking and linings
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteLeave your details and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookFrame and trusses standing, roof cover on, before sarking and linings
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Gables frame inspection

  • Steel beam and column connections to the engineering
  • Joist hanger size against each member
  • Double beams laminated on both faces
  • Beams kept full depth at bearings
  • Tie down bolts at every bracing panel
  • Strap bracing tensioned and fixed
  • Roof bracing bent over and nailed
  • Bottom plates bearing on the slab
  • Damaged or split members
  • Studs plumb and straight
  • Structural grout under base plates
  • Waste and sewer points in position
  • Bolts tight at steel connections
  • Anti-crush plates where specified
Why it matters here

Frame inspections on Gables builds

Many Gables homes combine timber framing with steel beams and columns, and the connections between them are where our frame findings gather. Beam and column supports built differently from the engineer's detail. A joist hanger smaller than the timber it carries. A double beam laminated on one face only, and a beam thinned where it sits on a steel post. Add tie down bolts missing at bracing panels and strap bracing left slack.

What we find at this stage in Gables

  • Connections not matching the engineering
  • Undersized joist hangers
  • Double beams laminated on one face
  • Tie down bolts missing at bracing
  • Strap bracing not tensioned
Metal strap bracing left slack, so it cannot brace the wall as designed, found during a frame inspection in Gables
Metal strap bracing left slack, so it cannot brace the wall as designed
Sample findings

Sample defects found during our frame inspections in Gables

Annotated findings from Frame inspections.

Steel beam support differing from the engineering, so it must be fixed or signed off, found during a frame inspection in Gables
Steel beam support differing from the engineering, so it must be fixed or signed off
Joist hanger too small for the timber member it is meant to carry, found during a frame inspection in Gables
Joist hanger too small for the timber member it is meant to carry
Timber beam reduced in thickness where it bears on a steel post, found during a frame inspection in Gables
Timber beam reduced in thickness where it bears on a steel post
Tie down bolt shown on the engineering but missing from a bracing panel, found during a frame inspection in Gables
Tie down bolt shown on the engineering but missing from a bracing panel

The other stages of a Gables build

  1. Bored piers inspection in Gables1Bored piersOnce the piers are bored, before any concrete arrives
  2. Slab pre-pour inspection in Gables2Slab pre-pourThe day before the pour, once steel and pods are set
  3. Lock-up (pre-plaster) inspection in Gables4Lock-up (pre-plaster)Roof, cladding, windows and rough-in done, before plaster
  4. Fixing inspection in Gables5FixingJoinery, doors and trims in, before the painter starts
  5. Waterproofing inspection in Gables6WaterproofingMembrane cured, before the tiler arrives
  6. Pre-handover (PCI) inspection in Gables7Pre-handover (PCI)About two weeks before your handover date

All construction stage inspections in Gables →

Guides

Construction stage guides for Gables

All guides →

Book a frame inspection in Gables

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Gables: common questions

How long is the inspector on a Gables frame?

One to two hours on most single storey homes, longer on a double storey with steel.

What does not matching the engineering mean?

The connection on site is not the one drawn. The builder either changes it or obtains the engineer's certification that what was built works.

Why do joist hangers matter?

A hanger has to suit the width and depth of the member. Too small and the load is not carried as designed.

Will this be rechecked?

At lock-up we look at every open frame item again and record whether it was fixed.

Which documents should I send?

The engineering set, especially the beam schedule and bracing plan.

Is a steel connection something the builder can argue?

It is a comparison with the drawing rather than a judgement, which makes it straightforward to resolve.