Bored pier inspection in Gables

Position, depth and a clean base, checked while every hole is still open.

  • Once the piers are bored, before any concrete arrives
  • About 1 hour on site
  • Report within 24 hours
Request your quoteLeave your details and an inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookOnce the piers are bored, before any concrete arrives
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Gables bored piers inspection

  • Every pier position matched to the footing plan
  • Hole diameter taken at the collar
  • Depth confirmed against the design figure
  • Base cleared of loose spoil
  • Founding material compared with the soil report
  • Water in the hole noted
  • Cage size and bar count
  • Cage held centrally with spacers
  • Cover to the sides and base
  • Screw pier positions where used
  • Access and edge safety noted
  • Anything incomplete recorded as such
Why it matters here

Bored piers inspections on Gables builds

Piers come into Gables builds where a footing has to reach past fill or soft ground to the material the engineer designed for, and some lots use screw piers instead. On the one Gables pier job in our records the screw piers were set out where the engineering showed them. The common failings elsewhere in the north west are bases left full of loose spoil and holes still being drilled when the concrete was due.

What we find at this stage in Gables

  • Loose spoil left in the base of the hole
  • Piers incomplete when the pour was due
  • Depth short of the engineering
  • Cage sitting off centre
  • Position differing from the footing plan
Screw piers set out in the positions shown on the engineering plan, found during a bored pier inspection in Gables
Screw piers set out in the positions shown on the engineering plan
Sample findings

Sample defects found during our bored piers inspections in Gables

Annotated findings from Bored piers inspections.

Loose spoil in the base of a bored pier, to be cleaned out before pouring, found during a bored pier inspection in Epping
Loose spoil in the base of a bored pier, to be cleaned out before pouring, Epping
Pier hole still needing its base cleared down to firm ground, found during a bored pier inspection in Epping
Pier hole still needing its base cleared down to firm ground, Epping
Pier drilling still incomplete across the site when the inspector attended, found during a bored pier inspection in Beecroft
Pier drilling still incomplete across the site when the inspector attended, Beecroft
Boring still under way, with the piers not yet ready to inspect, found during a bored pier inspection in Beecroft
Boring still under way, with the piers not yet ready to inspect, Beecroft

The other stages of a Gables build

  1. Slab pre-pour inspection in Gables2Slab pre-pourThe day before the pour, once steel and pods are set
  2. Frame inspection in Gables3FrameFrame and trusses standing, roof cover on, before sarking and linings
  3. Lock-up (pre-plaster) inspection in Gables4Lock-up (pre-plaster)Roof, cladding, windows and rough-in done, before plaster
  4. Fixing inspection in Gables5FixingJoinery, doors and trims in, before the painter starts
  5. Waterproofing inspection in Gables6WaterproofingMembrane cured, before the tiler arrives
  6. Pre-handover (PCI) inspection in Gables7Pre-handover (PCI)About two weeks before your handover date

All construction stage inspections in Gables →

Guides

Construction stage guides for Gables

All guides →

Book a bored piers inspection in Gables

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Gables: common questions

How much time does a pier visit need on a Gables lot?

Around an hour for most lots, more where there are many piers or deep holes.

Are screw piers inspected differently?

We check their positions and what the installer records for each one, rather than looking into an open hole.

Why does the base need cleaning?

Loose material at the bottom compresses under load. The pier has to bear on firm ground, not on spoil that fell back in.

Which papers should a Gables owner send first?

The engineering footing plan and the soil report, so depths and positions can be checked against them.

What if the piers are not finished?

We record what is incomplete and can come back. It is better than inspecting half a site and assuming the rest.

Is this the same as the certifier's footing inspection?

No. The principal certifier's inspection serves the certificate. Ours records what we find for you.